Resilience Management for Water and Essential Utilities
Inquiry This course is not yet bookable.
Plan time-limited emergency operation of a utility service. Using your own case or an example, determine how long available staff and backup capacity can support it and when escalation is needed.
In the course case, a generator powers a pump for eight hours; fuel resupply is unconfirmed. A second generator needs staff already operating the first. Compare the options, set handovers and an escalation point before supply expires, and reassess duration if delivery is confirmed.
Your emergency procedure records available capacity, responsibilities and information handovers. Technical equipment approval remains with operations.
What you will work on
Describe a utility service and its possible cascading failures
Compare minimum resources and organisational options for limited operations
Work through fallback operation with limited staff and running time
Who it is for
Operations leaders in water and essential utility companies
Service owners in critical utility operations
Continuity and crisis coordinators
Topics
Service boundaries and disruption consequences
Energy, staffing and technical dependencies
Cross-sector cascading effects
Limited operations and replacement capacity
Coordination and restoration
Your result
Your emergency procedure shows how long service can continue with available staff and backup capacity and when information must be handed over.
Prerequisites
You need knowledge of a utility service and its operational interfaces, and either access to the organisational information required for the task or an example case. Sensitive technical plans need not be disclosed.
Format and approach
Planned as six to eight hours of self-study. Work individually on your own case or an example and revise your emergency procedure against the case; the time is a planning assumption.
During a power outage, a water service needs a contractor's mobile pumps. The contractor also serves other customers and needs water for its own operations. Determine what minimum service remains possible under those conditions.
In the course case, heavy rain cuts a site’s electricity supply while the building remains intact. Compare protection measures and backup power, then develop a procedure for maintaining the service.
In the course case, a water service’s pumps need an external backup supply during a power outage. Work out when continued operation remains manageable and when an orderly shutdown is needed. Use the case to develop a resilience plan for a site or service area.